While I was traveling from Glendive, MT, where SRS Crisafulli is based, to New Orleans, LA, for Battelle’s 2015 Contaminated Sediments Conference, the EPA was making an emergency trip from its office in Colorado to Glendive to begin to deal with the Bridger Pipeline oil spill, before this also became a contaminated sediments problem.

This is a stark reminder that while many of these projects are long term, and have defined goals, there are emergencies that require immediate action.

Da Nang Airbase, Vietnam: Cleaning the Ground

Da Nang International Airport

Photo: Agent Orange Action Group

At the Battelle Conference, the most unusual presentation came from Dr. Kent Sorenson, of CDM Smith. His client is the United States Agency for International Development (USAID); the site is the Da Nang Airbase, Vietnam. This airbase was used by the US military from 1959–1975. At the north end of the airbase, Operation Ranch Hand mixed, loaded, and stored 100,000 barrels of Agent Orange. The toxic Dioxin (2,3,7,8 – TCDD) is a component of Agent Orange, and was left behind, devastating those with prolonged exposure. The residuals represent the highest levels of dioxin in the world. The clean-up, which is happening now, is Thermal Conduction Heating under Vacuum Extraction, with insulated covers, and heater wells. The volume of material requiring treatment is 42,000 m3 of soil and 45,000 m3 of sediment.

Environmental Remediation at Da Nang Airport: USAID Dioxin Contamination Project Progress: Soil Sampling

Last year, USAID and CDM Smith received an Honor Award in Environmental Communication from the American Academy of Environmental Engineers and Scientists. The award recognized the public information and stakeholder involvement program associated with remediation of dioxin contamination at the Da Nang Airport in Vietnam.

“As we prepare to move and clean this ground, so have we moved mountains to bring the United States and Vietnam to this landmark moment,” said U.S. Ambassador David B. Shear. “We are both moving earth and taking the first steps to bury the legacies of our past. I look forward to even more successes to follow,” he added. Two U.S. companies, CDM Smith and Tetra Tech Inc., were awarded the contract for construction management and oversight of the entire project in coordination with the Vietnamese ministry.

Kent Sorenson’s presentation was focused on the technical aspects of the remediation, and he acknowledged the political and cultural environmental impacts as well.

Other Remediation Sites presented:

The Gowanus Canal. Yes! The Gowanus Canal Photo:

brainware3000/Flickr

Photo: brainware3000/Flickr

This NYC site was originally a shallow wetland that was an authorized fill site in 1849. There were 3 manufactured gas plants (MGP) plants which discharged into the canal, in addition to sewage.

From the late 1800's to the mid 1900's, hundreds of Manufactured Gas Plants supplied homes and industry with fuel for heating, cooking, and lighting. Today, the New York State Department of Economic Conservation, and others, are overseeing the investigation and cleanup of contamination left behind from these plants.

Brian Carr, Assistant Regional Counsel, U.S. EPA, New York, presented on the history and proposed Gowanus Canal cleanup. There was a Record of Decision (ROD) in 2013. (I had total acronym fatigue and confusion.)

The 100 page ROD document – the Record of Decision – outlines the $500 million cleanup which is now proceeding.  What are we cleaning? There are PAHs, PCB’s and heavy metals, including mercury, lead, copper and bicycles on their way out of the Gowanus Canal.

Acronym cheat sheet:

PAH: Polycyclic aromatic hydrocarbons. PAHs have been identified as carcinogenic and mutagenic (as well as teratogenic), and are considered pollutants of concern for the potency of potential adverse health impacts; the same holds true of their presence at significant levels over time in human diets.

PCB: polychlorinated biphenyl. According to the U.S. Environmental Protection Agency (EPA), PCBs cause cancer in animals and are probable human carcinogens, and they have been widely disbursed in the environment, way beyond the Hudson River, which we have all heard so much about.

Conference Notes

This conference – the 8th – that Battelle has assembled on this topic was well attended. Organizers commented on the attendance of over 1,000 sophisticated project managers, scientists, vendors, contractors, and representatives of industry – Dow, DuPont, Honeywell, The Boeing Company – as well as the regulatory EPA, and the Scientific community from the Corp of Engineers.

Dr. Todd Bridges, Senior Research Scientist at the Research & Development Center of the US Army Corp in Vicksburg, Mississippi, was particularly outspoken, advocating for full and open deliberations within the Community of Environmental Remediation stakeholders.

Todd led a spirited review of decision making processes, and advocated that “sunlight is the best of disinfectants.”

The Conference’s closing roundtable panel addressed the question: Can Urban Master Planning Help Resolve the Cost/Benefit Impasse at Large Contaminated Sediment Sites. The panel told stories of reconnecting communities to their rivers, using design competitions and economic development projects to increase the values of the outcomes.

Great idea.

Yes, we will provide updates and comments on the impact of the January 17, 2015 Bridger Pipeline Yellowstone River oil spill on these pages in the weeks and months ahead.  So far, of the 50,000 gallons of oil originally believed released, responders have recovered more than 21,000 gallons from both the pipeline and the Yellowstone River.

Links:

USAID Da Nang Airport Cleanup

Gowanus Canal Record of Decision

Bridger Pipeline Oil Spill Response

Topics: EPA, habitat remediation, Glendive, International Market, Battelle, USAID, dioxin, Da Nang, Agent Orange, Bridger Pipeline

Overcoming Challenges in the International Dredge Market

Posted by John Zuccerella on Wed, Jan 30, 2013 @ 09:01 AM

SRS Crisafulli, Inc. ships a shallow draft dredge to Manila, Philippines to ring in 2013

CIMG1511comp

After a year of close collaboration with the customer, SRS Crisafulli’s versatile resources in both engineering and manufacturing resulted in shipment of a Rotomite SD-110 shallow draft dredge to Maynilad Water Service in the Philippines.

Three Philippine firms played key roles to close the deal – i.e., Maynilad Water Services, a private water and wastewater provider for the 17 cities and municipalities that comprise the West Zone of the greater Metro Manila area, WaterKonsult Equipment and Service, Inc., a leading equipment and service supplier serving Maynilad and many other Philippine water utilities and water districts, and SRS Crisafulli’s authorized Factory Representative, Ramoncito “Chito” Manaois, of RFM Machinery & Equipment Corp. of Manila, Philippines.

In February of 2012, Waterkonsult contacted SRS Crisafulli through SRS Crisafulli’s website.

Maynilad Water Service needed to remove sediment at its La Mesa Treatment Plant 1.  The sediment-bearing water comes from the Angat Dam and travels more than 30 kilometers to the plant. The river also carries silt to the treatment plant where sludge is collected at the bottom of sedimentation basins. To achieve acceptable, sustained settled water quality and to comply with environmental regulations, La Mesa Treatment Plant 1 must clean its sedimentation basins twice a year.  Cleaning the basins twice a year will preserve basin capacity and water quality.

Waterkonsult learned of Maynilad’s bid offering and contacted SRS Crisafulli. Waterkonsult, in association with Crisafulli’s Philippine sales representative, asked SRS Crisafulli for detailed product specifications for the Rotomite SD-110 dredge, and what makes the Rotomite SD-110 a superior dredge.  

Over the next several months, personnel from Crisafulli, Ramoncito, and Waterkonsult collaborated with Maynilad, answering requests for more information on the Rotomite SD-110. After satisfactorily answering all the requests, the Rotomite SD-110 dredge was selected. The winning SD-110 package offers a high-performing dredge pump able to move 1500 gpm at 80ft TDH in water.  The cutterhead has a 90-inch by 15-inch opening for high sludge production. The hydraulic thruster enables the dredge to be driven like a boat.

On December 31, 2012, the Rotomite SD-110 left SRS Crisafulli’s Factory headed for Manilia for delivery in February 2013. Pursuant to SRS Crisafulli’s superior worldwide service, a SRS Crisafulli Factory-trained engineer will travel to Manila to support the installation and to commission the Rotomite SD-110 dredge.